360 forged concave ::::: You asked for it!!!
#16
"Development is complete on these 3 styles and the first limited production run of only 40 sets is currently being manufactured. These initial 40 sets will be offered on a first come first serve basis and delivery time will be January 2010."
With the greatest respect, this seems a tad long for delivery on wheels that are "currently being manufactured". Was that a typo?
With the greatest respect, this seems a tad long for delivery on wheels that are "currently being manufactured". Was that a typo?
#19
"Development is complete on these 3 styles and the first limited production run of only 40 sets is currently being manufactured. These initial 40 sets will be offered on a first come first serve basis and delivery time will be January 2010."
With the greatest respect, this seems a tad long for delivery on wheels that are "currently being manufactured". Was that a typo?
With the greatest respect, this seems a tad long for delivery on wheels that are "currently being manufactured". Was that a typo?
I just saw the initial post and this one as well and was thinking the same thing. J 2010 does seem a long way away. I love the wheel btw.
#21
Thanks for all the positive compliments..
-JON
#22
Can't wait to see the real wheels and not the renderings. Those are gonna be hot!
__________________
damon@tirerack.com
877-522-8473 ext. 4643
574-287-2345 ext. 4643
**Don't forget to add my name to online orders!**
Or use this link:
http://www.tirerack.com/a.jsp?a=BH1&url=index.jsp
damon@tirerack.com
877-522-8473 ext. 4643
574-287-2345 ext. 4643
**Don't forget to add my name to online orders!**
Or use this link:
http://www.tirerack.com/a.jsp?a=BH1&url=index.jsp
Last edited by damon@tirerack; 06-05-2009 at 02:14 PM.
#30
Should be sooner than later.